Task phases: plans that change over time
Build a challenge that gets harder, lighter or different week by week. How phases and active periods work, what people see and how they are scored.
Rédigé par l’équipe MyGritWall4 min de lecture
Cet article est disponible en anglais.
The short answer: give each task an active period, such as weeks 1 to 2 or days 15 to 30, and group tasks into named phases like “Build the habit” and “Go further”. Each day, people only see and check in on the tasks that are active, and their rates and streaks only count the days a task was due. The challenge moves from phase to phase by itself.
Most good plans are not the same every day. A running plan builds up. A language challenge starts with sounds and moves to sentences. A savings challenge starts by tracking and later adds a weekly transfer. Without phases you would have to edit tasks by hand on the right day, or put everything into one long list from the start. This guide explains how phases work in MyGritWall and how to design a plan with them.
Phases and active periods
There are two pieces. An active period belongs to a task: it says when the task is due, either from week to week or from a first day to a last day of the challenge. A task without an active period runs for the whole challenge. A phase is a named stage with its own weeks, for example “Weeks 1 to 2: Build the habit”. Tasks in a phase follow the phase’s weeks.
A task’s own active period wins over its phase. That lets you keep one task in a phase but start it a week later, without making a separate phase for it.
What participants see
- The Plan tab shows the phases and tasks in the order they run, with the current phase highlighted.
- Upcoming phases are visible, so nobody is surprised when the plan changes.
- Today and the check-in sheet only show tasks that are active today.
- Reminders for a task only fire on days it is active.
A short example: a four-week walking challenge with two phases. Weeks 1 and 2 are called “Find your rhythm” and hold one task, a 20-minute walk on weekdays. Weeks 3 and 4 are called “Go further” and hold a 30-minute walk on weekdays plus one longer walk at the weekend. In week one, Today shows only the short walk. On the first day of week three, the longer tasks appear by themselves, and the short walk is gone.
Seeing the next phase ahead of time matters. People pace themselves differently when they know week three gets harder, and they are more likely to stay when the change is a planned step rather than a sudden jump.
How phases are scored
Completion rates, streaks, outcomes, leaderboards and recaps only count the days a task was active. A task that runs in weeks 3 and 4 does not count as missed in weeks 1 and 2. Someone who joins late is measured from the day they joined, as in every challenge. So a phased plan is exactly as fair as a flat one: everyone is measured on what was actually due for them.
This also means a harder phase does not quietly ruin anyone’s rate from the start. If the last phase asks for more, the days before it were scored on what they asked for. People who did well in the gentle weeks keep that record, and the harder weeks are judged on their own terms.
Designing a phased plan
- Write down what people should be able to do by the last day.
- Split the challenge into two to four phases, each with one clear focus.
- Give each phase a name that says its purpose, such as “Find your rhythm”.
- Put the tasks for each phase in it, and leave tasks that never change without a period.
- Make the first phase the easiest; most people drop out early, not late.
- Read the Plan tab as a participant would before you start.
A target cannot grow by itself inside one task, for example plus five percent every week. Use one task per phase instead: “Walk 20 minutes” in phase one, “Walk 30 minutes” in phase two. That is clearer for participants anyway, because each phase says exactly what is asked.
- Build up: easy base, then more, then a final stretch.
- Change focus: technique first, then volume, then a test.
- Taper: hard middle weeks, then lighter last days before an event.
- Add on: start with one habit and add a second when the first is steady.
Editing phases once the challenge runs
Before the start, everything can be edited. After the start, a phase or period that has already begun keeps its start date, and its end can move to today or later. Periods that have not started yet can still be changed freely. That protects what people already did while letting you adjust what is coming.
Templates can carry phases too. If you start from a template and shorten it, phases that would run past the new end are cut, and you are told before you start. Browsing a few templates is also a quick way to see how other people structure a plan.
Liste de contrôle
- Each phase has one clear focus and a name.
- The first phase is the easiest.
- Tasks that never change have no period.
- Growing targets use one task per phase.
- You read the Plan tab as a participant before the start.
- Later phases are adjusted before they begin, not after.
Phases let a challenge grow with the people in it, without anyone editing tasks at midnight. Sketch the stages, name them, and let the plan move on by itself. Start a challenge below, or take a phased template and make it yours.
Lancez un défi pour votre public
Fixez un objectif, ajoutez quelques tâches et partagez un seul lien. Rejoindre un défi gratuit reste gratuit.